S = A * B A - длина в метрах B - ширина в метрах
Solution Price: 26 630 руб
Add to Cart
623.00 rub.

Selected, м²:

Attention! The calculation is for informational purposes only. Before ordering, we recommend you to consult with specialists.

Noiseproofing of floor takes 9-10 cm.

PROCESS CHART:

Step 1

Before starting works related to soundproofing of the floor, thoroughly check the floor slab and joints between the slab and the walls for cracks. Any cracks discovered should be filled up with cement and sand grout (CSG).

Remove any roughness from the floor slab. If the slab is tilted heavily (the difference of levels throughout the space is > 2 cm), use leveling screed.

1

Step 2

Install MaxForte damping tape on perimeter along the walls in two layers.

8

Step 3

Place MaxForte-ECOplate 110 kg/m3 plates on the leveled floor tight to each other.

10

Step 4

Install waterproofing on MaxForte-ECOplate Floor. Ordinary polyethylene construction membrane 0.2 mm in thickness can be used. The film should always be extended to the walls at a height of 10 cm. Separate strips of the film should be laid with an overlap of at least 20 cm. Joints should be sealed with tape.

19

Step 5

Mount BP-1 reinforcing net 4-5 mm in thickness with 50 x 50 mm or 100 x 100 mm cells on the screed guides 20-25 mm in height.

20

Lay the net with an overlap of joints of at least 25 diameters of the reinforcement (10-12.5 cm).

22

Step 6

Pour floating cement and sand screed 50-70 mm in thickness with surface density of ≥ 100 kg/m².

M300 sandcrete is usually used for screed. Complete drying takes 3-4 weeks.

Pour the screed in each room separately.

27

IMPORTANT: floating screed must not touch the slab or the walls. Otherwise, sound bridges are formed and the soundproofing level goes down significantly!

Apply MaxForte damping tape between the screed and the walls.

After the screed dries out, cut excess of the tape along the perimeter and seal the joint with non-solidifying MaxForte vibroacoustic sealant.

shumoizol 5

Step 7

After the floor noiseproofing work is over, mount the finish floor.

Attention: skirting should be attached to either only the floor or only the walls.